Fee Schedule

City of Red Bluff
FIRE DEPARTMENT FEES

Fee # Fee Service Name / Description Fee 7/6/2019 to present
  Miscellaneous Items  
1 Base Hourly Rate (Plan Check/Inspection/Re-Inspection) $94 
2 Fire Chief Full Cost Recovery Hourly  $80 
3 Division Chief Full Cost Recovery Hourly  $71
4 Captain Full Cost Recovery Hourly  $63
5 Engineer Full Cost Recovery Hourly $51
6 Firefighter Full Cost Recovery Hourly $42
7 Reserve F/F Cost Recovery Hourly  $16
8 Admin Asst Full Cost Recovery Hourly $33 
9 Fire Marshall Full Cost Recovery Hourly  $58
10 Apparatus Cost Recovery Hourly  $90
11 Administrative Processing Fee  10%
12 Weed Abatement Mitigation (Property Clean-up)  Cost
13 DUI Response Cost
14 False Alarm (after 3rd malfunction in 180 days)  Cost
15 Life Safety Report (1-4 pages: $10, then additional $.50 each page)  $10
16 Reports (1-4 pages: $10, then additional $.50 each page) $10
17 File Search (special request for assistance)  $33 
18 Hydrant Flow Test (existing hydrants)  $94 
  New Construction Review/Inspection  
19 Civil Plan Design Review $188
20 Underground Fire Service Lines (per system)  $376 
21 Fire & Life Safety (10% of Building Plan Review, or $188 Minimum)  
  Fire Protection Systems Review/Inspection  
  New Fire Sprinkler System (NFPA 13 & 13R) Per Riser  
22 1-100 Heads $564
23 101-200 Heads $658
24 201-350 Heads $752
25 Per Head >350  $2
  Tenant Improvement Sprinkler System (13 & 13R) Per Riser  
26 1-19 Heads $188 
27 20-100 Heads $376
28 Per Head >100 $2
29 New Fire Sprinkler System (Single Family Dwelling 13D) $282
30 Fire Pump $376 
31 Fire Standpipe System  $282
32 Kitchen Hood System $282
33 Pre-Engineered Suppression Systems (Spray Booth & Rooms)  $282
  New Fire Alarm System Per System  
34 1-50 Devices $376
35 51-100 Devices $470 
36 101-500 Devices $564
37 Per Device >500 $2
38 Dedicated Function Alarm System $282
39 Fire Alarm Control Panel (FACP) Replacement  $188 
40 Vehicle Access Gate (KNOX/Click-2-Enter) $188 
  Hazardous Material, Flammable, Combustible Installation/Modification  
41 Aboveground Tanks >60 Gallons Per Tank $188
42 Inspection (Per Hour)  $94
43 Underground Tank Per Tank $188
44 Inspection (Per Hour) $94
45 Emergency Generator w/ Fuel Tanks $282
46 Propane Tanks(s) Install/modify $282
47 Propane Exchange Rack $130
48 Other Hazardous Materials Plans Review (Per Hour)  $94
49 Other Hazardous Materials Related Inspections (Per Hour) $94
  Special/Limited Duration Permits Per Site or Event  
50 Land Clearing Permit  $130
51 Temporary Membrane Structure/Tent $130
52 Retail Fireworks Stand $130
53 Public Display of Fireworks/Pyrotechnical Special Effects $282
54 Christmas Tree/Pumpkin Lots  $130
  California Fire Code (CFC) Permits Required by Section 105.6.1 - 105.6.48  
55 Annual Operational Permits $130
56 Additional Permit Per Site $36
  Cost Recoverable Annual Inspections ($94 Per Hour; Additional Time  
  Billed to the next half (.5) Hour.  
57 A Occupancy (Theater, Church, Restaurants, etc.) $94
58 E Occupancy (Schools - Public and Private)  $94
59 H Occupancy (High Hazard)  $94
60 I Occupancy (Hospitals, Institutions, Correctional 850 Req. and Annual)  $94
61 R Occupancy (Hotel/Motel, Apartment Complex)  $94
62 Residential Care Facilities (R2.1, R3, R4 850 Req. and Annual) $94
63 Large Family Day Care Home (850 Requests)  $94
64 Target Hazard Occupancy  $94
65 Twice Failed/Failure to Return Annual Self-Inspection $94
66 Miscellaneous/Requested Inspection  $94